CHECK 06

Outdoor Court Condition Check

Screen asphalt and concrete courts for preparation blockers before paint.

Condition input

Outdoor substrate screen

See the result ↓
Before this becomes a specification: verify current governing-body dimensions, the venue standard, floor-system compatibility and the coating’s written coverage and cure conditions.

For coating work: read the current safety data sheet, plan ventilation and suitable PPE, isolate the work area, control ignition sources where relevant, follow local disposal requirements and reopen only in line with written product/system guidance.
Use the result

Keep the inputs with the output.

An estimate is repeatable only when the measured dimensions, source edition, line convention, paint data and waste assumption travel with it.