SET-OUT 09

Court Set-out & Squaring Calculator

Calculate target diagonals and compare measured diagonals without inventing a tolerance.

Input

Target rectangle and measured diagonals

See the result ↓
Before this becomes a specification: verify current governing-body dimensions, the venue standard, floor-system compatibility and the coating’s written coverage and cure conditions.

For coating work: read the current safety data sheet, plan ventilation and suitable PPE, isolate the work area, control ignition sources where relevant, follow local disposal requirements and reopen only in line with written product/system guidance.
Use the result

Keep the inputs with the output.

An estimate is repeatable only when the measured dimensions, source edition, line convention, paint data and waste assumption travel with it.