METHOD 05
Marking Method Selector
Compare guided hand application, hybrid work and a dedicated marking machine.
Before this becomes a specification: verify current governing-body dimensions, the venue standard, floor-system compatibility and the coating’s written coverage and cure conditions.
For coating work: read the current safety data sheet, plan ventilation and suitable PPE, isolate the work area, control ignition sources where relevant, follow local disposal requirements and reopen only in line with written product/system guidance.
For coating work: read the current safety data sheet, plan ventilation and suitable PPE, isolate the work area, control ignition sources where relevant, follow local disposal requirements and reopen only in line with written product/system guidance.
Use the result
Keep the inputs with the output.
An estimate is repeatable only when the measured dimensions, source edition, line convention, paint data and waste assumption travel with it.